© Guldmann 08/2021 # 900667_102
© Guldmann 08/2021 # 900667_102
8• Look for unusual or signicant discoloration
• Look for snags, punctures, tears, holes
• Look for frayed or insecure seams
• Look for any acid / caustic / thermal burns
• Look for changes in material consistency, e.g. increased
stiness
• Look for any imbedded particles
Has the shape of the sling been altered, made shorter or
longer in relation to the original size using knots, needles,
tape or other methods?
Conclusion
If the sling suers from one or more of the above mentioned
conditions then it must be taken out of service regardless of the
weight of the person to be lifted.
2.03 Disposal of slings
Slings are disposed of by incineration.
By proper incineration polypropylene and polyester will be
degraded to carbon dioxide and water.
3.00 Service and lifetime
3.01 Safety/service inspections
In accordance with international standard EN/ISO 10535 “Hoist
for the transfer of disabled persons – Requirements and test
methods” an inspection must be performed every 6-month
according to the following instructions, which is not intended to
represent all potential inspection steps. Potential damage may
vary. Judgment of inspector/site prevails.
Safe Operating Practices with Slings
Considerations for damaged or defective slings and taking them
out of service. Withdraw the sling from service if any of the follow-
ing conditions exist:
• chemical or caustic burns
• melting or charring of any part of the sling
• snags, punctures, tears or cuts
• broken or worn stitches
• missing, illegible or incomplete sling tag
• knots in any part of the sling
• abrasion
• other visible damage that causes doubt as to the strength
of the sling
Sling inspection is done for the protection of the user, the care-
giver, and the overall hospital site safety. A sling inspection system
has additional benet. Systematic sling inspection will assist in the
identication of damage trends, potentially leading to cost eective
suggestions and results. The inspection process can also help to
identify inventory duplicity in certain sling types and sizes.
Sling inspection system
Development of a specic procedure and program for the inspec-
tion of slings at your facility is your best safeguard. Consider em-
ploying a three part system of inspection. Slings that are removed
from service and are not capable of repair should be disposed of
so they are unt for any future use and can not nd a way back
into active inventory.
1)Initial
This level of inspection is done at the time that the sling is re-
ceived into your facility. The inspector should insure that no dam-
age has occurred during transit, and also verify that the sling work
load limits match those contained in the manufacturer’s catalogue.
If your facility documents the sling inspection process through writ-
ten inspection records, the paper trail should begin at this stage
2)Frequent
The frequent level of inspection should be done by the sling user
before each use. The sling should be examined and removed
from service if damage is detected. The sling user should also
determine that the sling is proper for the user conditions, care task
required and the required weight capacity.
3)Periodic
Your facility might want to consider implementing a program for a
periodic level of inspection at regular intervals. The interval should
be based upon the frequency of use, severity of the service cycle
and information derived through the inspection process. Recom-
mendations to prevent damage and enhance service life could
be made by sta that perform the periodic inspections. If written
inspection records are maintained, they should always reference
the unique sling identication number, and be updated to record
the condition of the sling. Not intended to represent all potential
inspection steps or all potential aspects of product management
program. Judgment of inspector/site prevails.
Slinginspectiontechnique
The sling inspection procedure should be thorough, systematic
and consistent; both visual and “hands on” inspection techniques
are recommended. Certain forms of damage are far more discern-
able through hands-on inspection, than by visual inspection. For
example, fabric stiness, crushed webbing, as well as, thinning
fabric can be identied through tactile inspection. Visual inspec-
tion alone may not reveal all forms of sling damage. Once signs
of damage have been identied, do not downgrade the work
load limit of the sling, with the intent of continuing to use it, but at
limited capacity or frequency. This is sometimes done to get more
service life out of a damaged sling. The operating rule and stand-
ard should be: intact = use; damage = do not use.
Consider the practice of documenting sling inspections through
written inspection records. The documentation should include
information such as: the name of manufacturer, the sling stock
number, width and length, the unique sling identication number
(important in dierentiating similar slings), as well as the condition
of the sling. Other important information might also include the
date it was received or put into use at your facility and any special
features (if applicable). A benecial outcome of an inspection pro-
gram would be the realization of repetitive forms of damage and
the analysis that would lead to specic recommendations.
Sample visual examples of synthetic sling damage x)
Chemical/caustic burns
Broken stitching
Crushed / Frayed webbing