22 GB/IE
Installation
Make sure you will not be drilling into electrical, gas or water lines inside
the wall. Use a power drill to drill the holes into the brick wall. Always ob-
serve all safety instructions for the power drill in the manual for the power
drill. Death or injury due to electric shock may otherwise result.
When selecting the mounting location, pay attention to the following:
Make sure that the spotlight 1 illuminates the desired area. You can
move the spotlight 1 vertically.
Make sure the motion detector 9 covers the desired area. The motion
detector 9 has a maximum coverage range of 12 m, with a cover-
age angle of about 180° (depending on the mounting height – a
height of 2.50 m is ideal) (Fig. D).
Make sure the motion detector 9 is not illuminated at night by street
lighting. This can influence its functioning.
During mounting, proceed as described below:
Unscrew locking screw 5 by using a screw driver (cross type) to
detach the mounting stirrup 4 from the spotlight 1.
Hold the mounting stirrup 4 so that it is horizontal (possibly with a
spirit level) against the wall and mark the fastening holes.
Now drill the fastening holes (Ø 6 mm) and push the wall plugs into
the drill holes (Fig. A).
Secure the mounting stirrup 4 onto the wall using the screws provided.
Now use the screw driver (cross type) to attach the spotlight 1 to the
mounting stirrup 4 by using the previously removed locking screw 5,
spring washer 2, and metal nut 3 (Fig A).
Open the connection box 6 after you have released the lid of the
connection box 6 with a cross type screwdriver.
Insert the connection cable (not include in the product), type H05RN-F
3G 1.0 mm2 , through the cable gland 7 and into the connection box
6. The length for the connection cable line should not exceed 2.5 m.
Fix the connection cable with the cable clamp 14 first and then by
turning the nut of the cable gland 7.