SmartMetals 062.7295 Handleiding

Categorie
Flat panel vloersteunen
Type
Handleiding
1 2
3 4
C
E
F
F
G
H
A
B
C
a
b
c
c
d
D
e
f
DG 80x35 (4x)
a
M8x25 (4x)
b
M8 (8x)
c
M8 (4x)
d
M8x16 (2x)
e
M8x16 (2x)
f
SmartMetals Mounting Solutions B.V. • Handelsweg 4 • 4231 EZ Meerkerk • The Netherlands • T +31(0)183352942 • F +31(0)183352909 • E [email protected]
MOUNTING INSTRUCTIONS 062.7275/.7295 Floor lift mini & XL on wheels for (touch-) flat screens max. 120 kg BLACK
INSTALLATIE INSTRUCTIES 062.7275/.7295 Vloerlift mini & XL op wielen voor (touch-) flatscreens max. 120 kg ZWART
1 2
3 4
C
E
F
F
G
H
A
B
C
a
b
c
c
d
D
e
f
DG 80x35 (4x)
a
M8x25 (4x)
b
M8 (8x)
c
M8 (4x)
d
M8x16 (2x)
e
M8x16 (2x)
f
English
1. Fasten the lifting column (A) on the wheel frame(B)
in such a way, that the position of the lifting column
cable (C) corresponds as shown in the gure.
2. Mount the stand head (D)( part for mounting the
display) on the lifting column. Run lifting column
cable (C) through the cable transit in the stand
head. Attach cable (C) to the supplied motor cable
(E) and connect it with entrance 1 of the control
box.
3. Fasten two M8 x 16 bolts in the two upper holes at
the back side of the display. Keep enough distance
between the bolt’s head and the back side of the
display for the following step.
4. Hang the display in the head by sticking the
bolts in the keyholes and lowering them. Fasten the
display according its VESA pattern, by mounting the
remaining two bolts in the display via the back side
of the head. Following fasten all bolts in the display.
Nederlands
1. Bevestig de hefkolom (A) zodanig op het
wielframe (B) dat de positie van de
hefkolomkabel (C) overeenkomt zoals weergegeven
in de afbeelding.
2. Monteer de statiefkop (D) (onderdeel t.b.v.
montage van het scherm) op de hefkolom. Voer de
hefkolomkabel (C) via de doorvoer in de statiefkop
naar boven. Verbind kabel (C) met de bijgeleverde
motorkabel (E) en sluit deze aan op ingang 1 van de
controlbox (F).
3. Draai twee M8 x 16 bouten in de twee bovenste
gaten aan de achterzijde van het scherm. Houd
voldoende ruimte over tussen de boutkop en de
achterzijde van het
scherm t.b.v. de volgende stap.
4. Hang het scherm aan de kop door de
gemonteerde boutkoppen door de
slotgaten te steken en te laten zakken. Fixeer het
scherm conform het VESA patroon, door de overige
twee bouten via de achterzijde van de kop in het
scherm te monteren. Vervolgens alle vier bouten in
het scherm aandraaien.
SmartMetals Mounting Solutions B.V. • Handelsweg 4 • 4231 EZ Meerkerk • The Netherlands • T +31(0)183352942 • F +31(0)183352909 • E [email protected]
MOUNTING INSTRUCTIONS 062.7275/.7295 Floor lift mini & XL on wheels for (touch-) flat screens max. 120 kg BLACK
INSTALLATIE INSTRUCTIES 062.7275/.7295 Vloerlift mini & XL op wielen voor (touch-) flatscreens max. 120 kg ZWART
5 6
7
Optional / Optioneel
E
up
down
063.7260
g
h
g
h
I
I
M6x16 (2x)
g
M6 (2x)
h
1 2
3 4
C
E
F
F
G
H
A
B
C
a
b
c
c
d
D
e
f
DG 80x35 (4x)
a
M8x25 (4x)
b
M8 (8x)
c
M8 (4x)
d
M8x16 (2x)
e
M8x16 (2x)
f
English
5. Determine the preferred position of the control panel
(G), at for example the bottom side of the display. Make
sure that the panel location is free from dust and grease.
Peel the upper layer from the double-sided tape and
press the control panel rmly to the display. After 24H the
fastening of the tape is optimal, until that time burden as
little as possible. Connect the cable of the control panel
via one of the cable transits with the control box.
Following connect the power cable (H) with the wall
socket (230V). Look at schematic image of step 4 for
more information.
6. Bundle the cables of the display, the motor cable,
power cable and the control panel cable according to
your own preferences, at the back side of the head with
Tie Wraps. Please note: unit must be in lowest position
when moved
Optional
7. Position the lockable lid as shown and make sure the
tips (I), on top of the lockable lid, t into the two slots of
the stand head. Fasten the lockable lid with the provided
mounting material.
Nederlands
5. Bepaal de gewenste positie van het
bedieningspaneel (E), bij voorbeeld aan de onderzijde
van het scherm. Zorg er voor dat de gewenste positie stof
en vetvrij is. Pel vervolgens de bovenste laag van de
dubbelzijdige tape af en druk het bedieningspaneel
stevig aan. Na vierentwintig uur is de hechting van de
tape optimaal, tot die tijd zo min mogelijk belasten! Sluit
tevens het kabeltje van het bedieningspaneel via een
van de doorvoeren (kabels) op de controlbox aan en
sluit de netstroom kabel (H) aan op een
wandcontactdoos (230V). Zie ook de schematische
weergave bij stap 2.
6. Bundel de bekabeling van het scherm, motorkabel,
netstroom kabel en het kabeltje van het bedieningspa-
neel naar eigen inzicht, aan de achterzijde van kop met
Tie Wraps.
Verplaats de lift alleen in de laagste positie!
slotgaten te steken en te laten zakken. Fixeer het scherm
conform het VESA patroon, door de overige twee bouten
via de achterzijde van de kop in het scherm te monteren.
Vervolgens alle vier bouten in het scherm aandraaien.

Documenttranscriptie

C MOUNTING INSTRUCTIONS INSTALLATIE INSTRUCTIES 1 DGa80x35 (4x) DG 80x35 2 (4x) a C 062.7275/.7295 Floor lift mini & XL on wheels for (touch-) flat screens max. 120 kg BLACK 062.7275/.7295 Vloerlift mini & XL op wielen voor (touch-) flatscreens max. 120 kg ZWART D 2 F F b b c c c c d d D A B b b M8x25 M8x25(4x) (4x) c c M8M8 (8x) (8x) d d M8M8 (4x) (4x) H H F F G G E a E C C a English 1. Fasten the lifting column (A) on the wheel frame(B) in such a way, that the position of the lifting column cable (C) corresponds as shown in the figure. 2. Mount the stand head (D)( part for mounting the display) on the lifting column. Run lifting column cable (C) through the cable transit in the stand head. Attach cable (C) to the supplied motor cable (E) and connect it with entrance 1 of the control box. 3. Fasten two M8 x 16 bolts in the two upper holes at the back side of the display. Keep enough distance between the bolt’s head and the back side of the display for the following step. 4. Hang the display in the head by sticking the bolts in the keyholes and lowering them. Fasten the display according its VESA pattern, by mounting the remaining two bolts in the display via the back side of the head. Following fasten all bolts in the display. Nederlands 3 e e e M8x16 (2x) 4 (2x) M8x16 4 f e f f f M8x16 M8x16(2x) (2x) 1. Bevestig de hefkolom (A) zodanig op het wielframe (B) dat de positie van de hefkolomkabel (C) overeenkomt zoals weergegeven in de afbeelding. 2. Monteer de statiefkop (D) (onderdeel t.b.v. montage van het scherm) op de hefkolom. Voer de hefkolomkabel (C) via de doorvoer in de statiefkop naar boven. Verbind kabel (C) met de bijgeleverde motorkabel (E) en sluit deze aan op ingang 1 van de controlbox (F). 3. Draai twee M8 x 16 bouten in de twee bovenste gaten aan de achterzijde van het scherm. Houd voldoende ruimte over tussen de boutkop en de achterzijde van het scherm t.b.v. de volgende stap. 4. Hang het scherm aan de kop door de gemonteerde boutkoppen door de slotgaten te steken en te laten zakken. Fixeer het scherm conform het VESA patroon, door de overige twee bouten via de achterzijde van de kop in het scherm te monteren. Vervolgens alle vier bouten in het scherm aandraaien. SmartMetals Mounting Solutions B.V. • Handelsweg 4 • 4231 EZ Meerkerk • The Netherlands • T +31(0)183352942 • F +31(0)183352909 • E [email protected] MOUNTING INSTRUCTIONS INSTALLATIE INSTRUCTIES 5 a DG 80x35 (4x) 2 062.7275/.7295 Floor lift mini & XL on wheels for (touch-) flat screens max. 120 kg BLACK 062.7275/.7295 Vloerlift mini & XL op wielen voor (touch-) flatscreens max. 120 kg ZWART D 6 F b M8x25 (4x) c M8 (8x) d M8 (4x) b c H c F d G C E E a up 7 e Optional / Optioneel M8x16 (2x) down 4 f I I e g M6x16(2x) (2x) M8x16 h M6 (2x) g h h 063.7260 g f English 5. Determine the preferred position of the control panel (G), at for example the bottom side of the display. Make sure that the panel location is free from dust and grease. Peel the upper layer from the double-sided tape and press the control panel firmly to the display. After 24H the fastening of the tape is optimal, until that time burden as little as possible. Connect the cable of the control panel via one of the cable transits with the control box. Following connect the power cable (H) with the wall socket (230V). Look at schematic image of step 4 for more information. 6. Bundle the cables of the display, the motor cable, power cable and the control panel cable according to your own preferences, at the back side of the head with Tie Wraps. Please note: unit must be in lowest position when moved Optional 7. Position the lockable lid as shown and make sure the tips (I), on top of the lockable lid, fit into the two slots of the stand head. Fasten the lockable lid with the provided mounting material. Nederlands 5. Bepaal de gewenste positie van het bedieningspaneel (E), bij voorbeeld aan de onderzijde van het scherm. Zorg er voor dat de gewenste positie stof en vetvrij is. Pel vervolgens de bovenste laag van de dubbelzijdige tape af en druk het bedieningspaneel stevig aan. Na vierentwintig uur is de hechting van de tape optimaal, tot die tijd zo min mogelijk belasten! Sluit tevens het kabeltje van het bedieningspaneel via een van de doorvoeren (kabels) op de controlbox aan en sluit de netstroom kabel (H) aan op een wandcontactdoos (230V). Zie ook de schematische weergave bij stap 2. 6. Bundel de bekabeling van het scherm, motorkabel, netstroom kabel en het kabeltje van het bedieningspaneel naar eigen inzicht, aan de achterzijde van kop met Tie Wraps. Verplaats de lift alleen in de laagste positie! slotgaten te steken en te laten zakken. Fixeer het scherm conform het VESA patroon, door de overige twee bouten via de achterzijde van de kop in het scherm te monteren. Vervolgens alle vier bouten in het scherm aandraaien. SmartMetals Mounting Solutions B.V. • Handelsweg 4 • 4231 EZ Meerkerk • The Netherlands • T +31(0)183352942 • F +31(0)183352909 • E [email protected]
  • Page 1 1
  • Page 2 2

SmartMetals 062.7295 Handleiding

Categorie
Flat panel vloersteunen
Type
Handleiding

in andere talen